Geraldton Boat Lifters Shed

20 August 2018
Case Study #517
Value Bracket$250 - 500K
Manufacture4 Weeks
Site time10 Days
AUSPAN Guarantee

Client Brief

Geraldton Boat Lifters needed a facility to service their clients vessels. To successfully deliver their
service offering, the building required had specific criteria that needed to be considered to ensure
successful operation.

Auspan Solutions

Auspan worked closely with the Geraldton Boat Lifters team and a builder they were working with (Bell Construction) to deliver exactly what they required. This included designing the main opening into the building to have the correct clearances with a reliable door system, ventilation and also considering
corrosion aspects due to the location of the building.

Challenges

Designing the quad track sliding door system to make sure it was the right balance between strength and being reliable / easy to use (works great with excellent feedback on the system). Installing a shed this tall in a windy coastal location, using the AUSPAN Roof Lift method meant that the roof was
completely sheeted and braced at ground level before standing the shed – the install team did a great job

Features

  • Quad track 13.5m(h) sliding door system
  • Sliding door out rigger system to allow the full end of the shed to be opened
  • Ridge and wall vents to maintain good working environment
  • High spec marine grade paint coating to main opening frame and external steel work.

AUSPAN Project Manager Testimonial

Interesting project to be involved in and great to deliver another custom building designed to suit the clients exact requirements.
A rewarding project to win over against another supplier that was using imported steel fabricated overseas. AUSPAN’s industry leading designs and processes meant the project was designed and fabricated in Western Australia.

Mike Richardson, Sales Consultant

Download case study
Click for other case studies

Customer Testimonial

The turnaround time for getting the whole shed fabricated and delivered to sight was
extremely fast and we had a good run with getting it installed in such windy conditions here in Geraldton.

Jason Winterbottom, Managing Director Bell Construction and Design

Latest News 08 May 2019 AUSPAN INFORM MAY 2019 Read More

Latest News 02 Apr 2019 AUSPAN INFORM APRIL 2019 Read More

Latest News 05 Mar 2019 AUSPAN INFORM MARCH 2019 Read More

Latest News 05 Feb 2019 AUSPAN INFORM FEBRUARY 2019 Read More

Latest News 08 Jan 2019 AUSPAN INFORM JANUARY 2019 Read More

SIGN UP to the 'AUSPAN INFORM'

The 'AUSPAN INFORM’ includes a monthly video update with:

If you're interested please leave your details below, thank you!